We engage in - depth communication with customers to comprehensively collect design concepts, fabric requirements (such as material, weight, functional indicators), color schemes, brand logos, and special process requirements (including embroidery, printing, 3D tailoring, etc.). Based on these information, we initiate the planning of exclusive design solutions.
2. Precise Quotation and Delivery Time Confirmation (Duration: 1 - 2 days)
After the customer confirms the design draft, fabric swatches, and process details, we provide a formal quotation including the unit price, minimum order quantity (MOQ), and an estimated delivery cycle to ensure that the requirements of both parties are precisely matched.
3. Customization and Approval of Fitting Samples (Duration: 7 - 10 days)
Once the customer accepts the quotation, we proceed to make fitting samples using the actual production fabric, with a focus on verifying the pattern fit, fabric texture, and process effect. We then optimize the details based on the customer's feedback until full approval is obtained.
4. Sales Contract Signing (Duration: 1 - 2 days)
After the fitting samples pass the inspection, we issue a sales contract that clearly defines core contents such as the order quantity, price terms, and delivery time. The contract comes into effect after being signed and sealed by both parties.
● Documents against Payment at Sight (D/P at sight): A 30% deposit is required to secure the order, and the balance is payable before delivery. ● Letter of Credit at Sight (L/C at sight): The customer needs to open a letter of credit after order confirmation. Upon receipt of the deposit or letter of credit, we immediately start fabric procurement and production preparation.
6. Final Review of Pre - production Samples)(Total Duration: 16 - 30 days, excluding express delivery time)
● Color Confirmation (Duration: 3 - 5 days): Provide at least two sets of Lab Dips (color samples) to accurately calibrate the color and ensure it is completely consistent with the design expectations. ● Pattern Fitting (Duration: 3 - 5 days): Make fitting samples using actual fabric and standard sizing. Optimize the pattern according to the fitting feedback to provide data support for mass production. ● Pre - production Review (Duration: 7 - 15 days): Once the fabrics and trims are in place, submit pre - production samples. Mass production will officially start only after the customer confirms that details such as the pattern, process, printing/embroidery are correct. ● Final Sample Inspection (Duration: 3 - 5 days): Once upon completion of production, randomly select finished sample garments in all sizes and colors. Delivery arrangements will be made only after receiving the customer's final approval.
7. Standardized Production Management
(Fabric and Trim Procurement Duration: 20 - 35 days, Total Production Duration: 20 - 35 days)
● Fabric and Trim Procurement: Purchase team order the fabrics and trims according to the quality standards and Lab Dips (color samples) confirmed by the customer.
● Material Pre - inspection: Professional QC team check the production fabrics to ensure they are completely consistent with the sample materials and specifications. ● Pre - production Planning: Hold production meeting to clarify the production plan, quality standards, and process requirements, and optimize the production process. ● Progress Tracking: Monitor the production progress daily, coordinate resources in a timely manner, and ensure on - time order delivery.
8. Three - Level Quality Inspection System (Throughout the Entire Production Process)
Adhere to the AQL2.5 international inspection standard and implement full - process quality control: ● Initial Raw Material Inspection: At the beginning of production, strictly verify the quality, color, and quantity of fabrics and trims. ●*In - process Inspection: Conduct real - time spot checks on process details during production, including stitching, printing, embroidery, color matching, etc. ● Final Product Inspection: Conduct a comprehensive inspection upon completion, covering process quality, ironing effects, packaging specifications, etc., to eliminate any defects.
9. Final Inspection of Bulk Samples (Duration: 1 - 2 days)
After production is completed, randomly select samples in all sizes and colors for the customer's final confirmation, ensuring that there is zero deviation between the bulk goods and the approved standards. Shipment arrangements can be made only after the inspection has been passed.
10. Flexible Logistics Solutions
Coordinate sea freight (suitable for economical bulk transportation) or air freight (suitable for urgent orders) according to customer needs. Proactively connect with the customer - designated freight forwarder; if there is no designated party, we will use our high - quality logistics resources to provide one - stop services such as space booking and customs clearance.
11. Payment and Document Delivery Closure
Submit a full set of shipping documents (bill of lading, invoice, packing list, etc.) to the bank. The customer then completes the balance payment in accordance with the bank's procedures, obtains the documents, and picks up the goods,thereby completing the entire order delivery process.